Load Forecasting Enhancement Act

Download PDF
Bill ID: 119/hr/9332
Last Updated: September 15, 2026

Sponsored by

Rep. Balderson, Troy [R-OH-12]

ID: B001306

Follow the money

The bill

Load Forecasting Enhancement Act

HR. 9332, 119th Congress — read as touching Electric Utilities.

The sponsor

Rep. Balderson, Troy [R-OH-12]

Every bill has someone who introduced it. That name is where the paper trail starts.

The money

$71,950 raised

23 itemised contributions to this sponsor, pulled from FEC filings.

The alignment

70% match to Project 2025

This bill's text tracks the "Department of Energy and Related Commissions" section, p. 437-439 of the Mandate for Leadership.

Bill's Journey to Becoming a Law

Track this bill's progress through the legislative process

Latest Action

Motion to reconsider laid on the table Agreed to without objection.

September 14, 2026

Introduced

📍 Current Status

Next: The bill will be reviewed by relevant committees who will debate, amend, and vote on it.

🏛️

Committee Review

🗳️

Floor Action

✅

Passed House

🏛️

Senate Review

🎉

Passed Congress

🖊️

Presidential Action

⚖️

Became Law

📚 How does a bill become a law?

1. Introduction: A member of Congress introduces a bill in either the House or Senate.

2. Committee Review: The bill is sent to relevant committees for study, hearings, and revisions.

3. Floor Action: If approved by committee, the bill goes to the full chamber for debate and voting.

4. Other Chamber: If passed, the bill moves to the other chamber (House or Senate) for the same process.

5. Conference: If both chambers pass different versions, a conference committee reconciles the differences.

6. Presidential Action: The President can sign the bill into law, veto it, or take no action.

7. Became Law: If signed (or if Congress overrides a veto), the bill becomes law!

Bill Summary

**HR 9332: Load Forecasting Enhancement Act – A Cynical Diagnosis**

**Main Purpose & Objectives:** On the surface, HR 9332 aims to improve electric load forecasting by creating regional joint boards under FERC to study best practices, enhance reliability and affordability, and eventually standardize forecasting methods via PURPA amendments. In reality, this bill is a placebo for a systemic illness: the grid’s inability to handle rising demand from data centers, EVs, and industrial electrification. Its true objective? To create the *appearance* of action while delaying hard decisions about infrastructure investment, cost allocation, and who pays for the grid’s unpreparedness. It’s not about better forecasting—it’s about spreading blame and buying time.

**Key Provisions & Changes to Existing Law:** The bill mandates FERC to establish regional joint boards (one FERC rep + one per state utility commission) within 90 days. These boards will study load forecasting practices—data collection, modeling, transparency, stakeholder engagement, economic impacts, and tech—then issue best practices reports within a year. FERC must then submit a consolidated report to Congress with recommendations for uniform state adoption. Crucially, it amends PURPA Section 111 to *require* that electric load forecasting procedures incorporate FERC’s forthcoming recommendations. It also forces state regulators to consider and implement these standards within two years, with loopholes for states that already acted (a nod to avoid preemption fights). The boards terminate after reporting—because nothing says “permanent solution” like a sunset clause.

**Affected Parties & Stakeholders:** - **State Utility Commissions:** Forced into unpaid labor on joint boards, tasked with producing consensus in regions where their interests clash (e.g., coal-dependent vs. renewable-rich states). - **Electric Utilities:** Will bear compliance costs to adopt new forecasting standards, likely passing them to ratepayers—while blaming “federal mandates” for rate hikes. - **FERC:** Gets expanded authority without additional resources, tasked with herding cats across 50 states. - **Large Load Customers (data centers, factories):** Scrutinized for financial commitments—because apparently, forecasting now requires credit checks. - **Congress & Voters:** Given a shiny report to point to while ignoring the real crisis: transmission bottlenecks and generation shortages. - **Ratepayers:** Ultimately foot the bill for studying the obvious: that predicting demand requires good data, honest modeling, and investment—none of which this bill funds.

**Potential Impact & Implications:** This is regulatory theater with a veneer of technocracy. The best practices will likely be bland, consensus-driven platitudes (“improve data quality,” “engage stakeholders”) that avoid controversial topics like cost allocation for grid upgrades or penalizing speculative load requests. By embedding these into PURPA, the bill creates a soft mandate that states can ignore or delay—especially if implementation costs rise. The real impact? More studies, more meetings, more reports—while the grid strains under unmanaged demand. It’s not a solution; it’s a bureaucratic sedative for a patient in cardiac arrest. If Congress wanted to fix load forecasting, they’d fund grid modernization. Instead, they’re forming a committee to study the thermometer while the patient burns. Diagnosis: legislative constipation. Treatment: laxatives and accountability—neither of which this bill provides.

Related Topics

Transportation & InfrastructureClimate Change & SustainabilityLabor & Employment Policy
Generated using Llama 3.1 70B (Dr. Haus personality)

💰 Campaign Finance Network

Rep. Balderson, Troy [R-OH-12]

Congress 119 • 2024 Election Cycle

Total Contributions
$71,950
17 donors
PACs
$0
Organizations
$950
Committees
$0
Individuals
$71,000

No PAC contributions found

1
THORP FOR SHERIFF
1 transaction
$500
2
FRIENDS OF MARK FRAIZER
2 transactions
$450

No committee contributions found

1
STEMMER, THOMAS A
3 transactions
$14,900
2
COLER, JOHN
3 transactions
$9,900
3
COLER, TABITHA
2 transactions
$6,600
4
BORKOWSKI, BRIAN
1 transaction
$3,300
5
MACKINNON, JEFFREY
1 transaction
$3,300
6
DICKERSON, RICHARD D
1 transaction
$3,300
7
LEMMON, THEODORE
1 transaction
$3,300
8
DICKERSON, JOAN
1 transaction
$3,300
9
DAY, TIMOTHY
1 transaction
$3,300
10
KVAMME, MARK
1 transaction
$3,300
11
FISCHER, ALEX
1 transaction
$3,300
12
WAGENBRENNER, MARK
1 transaction
$3,300
13
FAISON, JAY W
1 transaction
$3,300
14
RASTIN, TOM
1 transaction
$3,300
15
PARFITT, THOMAS
1 transaction
$3,300

Cosponsors & Their Campaign Finance

This bill has 6 cosponsors. Below are their top campaign contributors.

Rep. Menendez, Robert [D-NJ-8]

ID: M001226

Top Contributors

31

1
SCARINCI & HOLLENBECK
OrganizationLITTLE FALLS, NJ
$3,300
Mar 29, 2024
2
SAMPSON FOR ASSEMBLY
OrganizationBAYONNE, NJ
$1,000
Mar 26, 2024
3
ACTBLUE
CONDUIT TOTAL LISTED IN AGG. FIELD
OrganizationSOMERVILLE, MA
$1,000
Feb 4, 2024
4
ACTBLUE
CONDUIT TOTAL LISTED IN AGG. FIELD
OrganizationSOMERVILLE, MA
$1,000
Mar 31, 2024
5
FRANK X SCHILLARI FOR SHERIFF
OrganizationSECAUCUS, NJ
$1,000
Jan 30, 2024
6
SOPHIA ROOFTOP LLC
OrganizationJERSEY CITY, NJ
$1,000
Jan 30, 2024
7
BARONA BAND OF MISSION INDIANS
OrganizationLAKESIDE, CA
$1,000
Jun 24, 2024
8
ACTBLUE
CONDUIT TOTAL LISTED IN AGG. FIELD
OrganizationSOMERVILLE, MA
$500
Feb 25, 2024
9
ACTBLUE
CONDUIT TOTAL LISTED IN AGG. FIELD
OrganizationSOMERVILLE, MA
$500
Feb 18, 2024
10
ACTBLUE
CONDUIT TOTAL LISTED IN AGG. FIELD
OrganizationSOMERVILLE, MA
$500
Mar 31, 2024

Rep. Joyce, John [R-PA-13]

ID: J000302

Top Contributors

20

1
SPELL, JOE
TIDES MEDICAL • CEO
IndividualLAFAYETTE, LA
$3,500
Nov 4, 2024
2
SPELL, JOE
TIDES MEDICAL • CEO
IndividualLAFAYETTE, LA
$3,500
Nov 4, 2024
3
EDATTEL, PAUL
TODD STRATEGY GROUP • CONSULTANT
IndividualFALLS CHURCH, VA
$3,300
Mar 28, 2024
4
KIMBELL, JEFFREY
SELF-EMPLOYED • HEALTH CARE CONSULTANT
IndividualPARK CITY, UT
$3,300
Feb 13, 2024
5
SHOAP, VICKI
IndividualLURGAN, PA
$3,300
Mar 26, 2024
6
WALKER, KENT
GOOGLE LLC • PRESIDENT, GLOBAL AFFAIRS
IndividualMOUNTAIN VIEW, CA
$3,300
Mar 23, 2024
7
ALAM, MURAD
NORTHWESTERN UNIVERSITY • PHYSICIAN
IndividualCHICAGO, IL
$3,300
Mar 7, 2023
8
EDATTEL, PAUL
TODD STRATEGY LLC • CONSULTANT
IndividualFALLS CHURCH, VA
$3,300
Mar 31, 2023
9
KIMBELL, JEFFREY
SELF-EMPLOYED • HEALTH CARE CONSULTANT
IndividualPARK CITY, UT
$3,300
Feb 23, 2023
10
RAYDER, MARK
ALSTON BIRD, LLP • SENIOR POLICY ADVISOR
IndividualALEXANDRIA, VA
$3,300
Mar 20, 2023

Rep. Vindman, Eugene Simon [D-VA-7]

ID: V000138

Top Contributors

22

1
LUX FOR VIRGINIA
OrganizationLADYSMITH, VA
$500
Mar 29, 2024
2
LUX FOR VIRGINIA
OrganizationLADYSMITH, VA
$500
Mar 31, 2024
3
FORSTER-BURKE, DIANE
NOT EMPLOYED • NOT EMPLOYED
IndividualCOTTONWOOD HEIGHTS, UT
$4,000
Apr 20, 2024
4
FORSTER-BURKE, DIANE
IndividualCOTTONWOOD HEIGHTS, UT
$4,000
May 5, 2024
5
VON STEIN, THOMSON
IndividualROCKVILLE, MD
$3,500
Aug 7, 2024
6
HULL, MEGAN
SELF • ACTIVIST
IndividualWASHINGTON, DC
$3,300
Nov 2, 2024
7
KAISER, GEORGE
GBK CORPORATION • EXECUTIVE
IndividualTULSA, OK
$3,300
Oct 25, 2024
8
PARSONS, KATHLEEN
NOT EMPLOYED • NOT EMPLOYED
IndividualPOTOMAC, MD
$3,300
Oct 18, 2024
9
STAPLE, HARISE
SELF • MD
IndividualLOS ALTOS, CA
$3,300
Oct 18, 2024
10
HOLMES, LAURA
SELF • REAL ESTATE INVESTOR
IndividualBOCA RATON, FL
$3,300
Oct 22, 2024

Rep. Kean, Thomas H. [R-NJ-7]

ID: K000398

Top Contributors

22

1
EASTERN BAND OF CHEROKEE INDIANS
OrganizationCHEROKEE, NC
$3,300
Oct 24, 2024
2
EASTERN BAND OF CHEROKEE INDIANS
OrganizationCHEROKEE, NC
$3,300
Dec 27, 2024
3
LOEB, JOHN
RETIRED • RETIRED
IndividualPURCHASE, NY
$6,600
Nov 4, 2024
4
LOEB, JOHN
IndividualPURCHASE, NY
$6,600
Nov 4, 2024
5
VOCCOLA, FREDERICK
KASEYA • CEO
IndividualMIAMI, FL
$6,600
Mar 1, 2024
6
PISANO, JOHN
IndividualWEST PALM BEACH, FL
$3,700
Jan 22, 2024
7
VOCCOLA, FREDERICK
IndividualMIAMI, FL
$3,500
Mar 12, 2024
8
NIEMIEC, DAVID
SELF • INVESTMENTS
IndividualNEW YORK, NY
$3,300
Oct 11, 2024
9
TAYLOR, ALEXANDER
MATRIX DEV GRP • REAL ESTATE
IndividualBELMAR, NJ
$3,300
Oct 1, 2024
10
BRUECKNER, RICHARD F.
RETIRED • RETIRED
IndividualBEDMINSTER, NJ
$3,300
Oct 4, 2024

Rep. Griffith, H. Morgan [R-VA-9]

ID: G000568

Top Contributors

20

1
BUNN, JAMES O.
CENTRAL COAL CO • MINING ENGINEER
IndividualBRISTOL, VA
$3,300
Dec 18, 2024
2
CHARLES, DAVID
MOOD PRODUCTS GROUP LLC • EXECUTIVE
IndividualAUSTIN, TX
$3,300
Dec 4, 2023
3
HAMER, JONATHAN S.
MASTERY CONSULTING • BUSINESS CONSULTANT
IndividualRANCHO PALOS VERDES, CA
$3,300
Dec 22, 2023
4
JOURNAY, JUSTIN
3CHI • EXECUTIVE
IndividualFISHERS, IN
$3,300
Dec 22, 2023
5
PATEL, GOPESH
VLS PHARMACY INC • PHARMACIST
IndividualNEW HYDE PARK, NY
$3,300
Oct 26, 2023
6
RAY, RICHIE
RICHIE'S SPECIALTY PHARMACY • PHARMACIST
IndividualTHE WOODLANDS, TX
$3,300
Oct 27, 2023
7
RAY, RICHIE
RICHIE'S SPECIALTY PHARMACY • PHARMACIST
IndividualTHE WOODLANDS, TX
$3,300
Oct 27, 2023
8
WORLEY, JEFFREY
COLUMBIA CONSULTING • EXECUTIVE
IndividualARGYLE, TX
$3,300
Dec 6, 2023
9
BLUMENFELD, JACOB
QUEST MANAGEMENT GROUP LLC • REAL ESTATE
IndividualBALTIMORE, MD
$3,300
Feb 23, 2024
10
CRANE, DAVID
BOSE PUBLIC AFFAIRS GROUP • CONSULTANT
IndividualALEXANDRIA, VA
$3,300
Mar 6, 2024

Rep. McClellan, Jennifer L. [D-VA-4]

ID: M001227

Top Contributors

26

1
BARONA BAND OF MISSION INDIANS
OrganizationLAKESIDE, CA
$1,500
May 24, 2023
2
BARONA BAND OF MISSION INDIANS
OrganizationLAKESIDE, CA
$1,500
May 24, 2023
3
CHEROKEE NATION
OrganizationTAHLEQUAH, OK
$1,000
Dec 21, 2023
4
CHEROKEE NATION
OrganizationTAHLEQUAH, OK
$1,000
Dec 21, 2023
5
STARLEY LLC
OrganizationNORTH CHESTERFIELD, VA
$250
Oct 13, 2024
6
STARLEY LLC
OrganizationNORTH CHESTERFIELD, VA
$250
Oct 13, 2024
7
RICE, NANCY
LITTLE DIFFICULT RUN • CONSULTANT
IndividualVIENNA, VA
$6,600
Sep 23, 2024
8
RICE, NANCY
LITTLE DIFFICULT RUN • CONSULTANT
IndividualVIENNA, VA
$6,600
Sep 23, 2024
9
ABRAMSON, RONALD D
BUCHANAN INGERSOLL & ROONEY • ATTORNEY
IndividualWASHINGTON, DC
$3,300
Nov 15, 2023
10
FRIED, BARBARA J.
FRIED COMPANIES INC. • REAL ESTATE DEVELOPMENT
IndividualCROZET, VA
$3,300
Dec 19, 2023

Donor Network - Rep. Balderson, Troy [R-OH-12]

PACs
Organizations
Individuals
Politicians

Hub layout: Politicians in center, donors arranged by type in rings around them.

Loading...

Showing 28 nodes and 36 connections

Total contributions: $36

Top Donors - Rep. Balderson, Troy [R-OH-12]

Showing top 17 donors by contribution amount

2 Orgs15 Individuals

Industry Impact

Which industries are materially affected by specific provisions in this bill. 2 helped.

  • +Electric Utilitiesconfidence 0.80

    Section 2(c) establishes joint boards to study electric load forecasting, which could lead to best practices that enhance reliability and affordability of electric service, benefiting electric utilities.

  • Section 2(c)(1)(H) evaluates requests for electric service by industrial or commercial facilities, which may involve energy infrastructure projects, potentially benefiting the industry.

Who funds the sponsor on these industries

For each industry this bill affects, here's what the sponsor (Rep. Balderson, Troy [R-OH-12])received from donors associated with that industry during the 2022–present cycles. Donations are not proof of intent — they are a record of who funds the people writing the law.

Industries this bill HELPS

Project 2025 Policy Matches

This bill shows semantic similarity to the following sections of the Project 2025 policy document.AI-enhanced analysis provides detailed alignment ratings.

Department of Energy and Related Commissions

Moderate
Vector: 70%
Pages: 437-439AI Enhanced

AI Analysis:

"The bill focuses on improving load forecasting accuracy and transparency through FERC-led regional boards and PURPA amendments, which aligns with Project 2025’s broader goal of enhancing grid reliability and ensuring FERC prioritizes service to end users. However, the bill does not directly address RTO reform, market restructuring, or the specific mechanisms (e.g., dispatchable resource valuation, dual markets) emphasized in the Project 2025 policy."

Key themes:FERC authoritygrid reliabilityelectric service to consumerstransmission and load forecastingstate-federal coordination

— 404 — Mandate for Leadership: The Conservative Promise l Unlike vertically integrated utilities that are accountable to state elected officials and state public utility commissions, RTOs and their participants are accountable only to FERC. Even then, however, accountability is indirect through the tariffs (rules) that the RTOs adopt and FERC approves. In addition, unlike utilities, generators in an RTO have no obligation to serve customers. New Policies FERC must make reliability of the grid and service to end use top priorities. To do so, it should: l Reexamine the premise of RTOs. RTOs no longer seem to work for the benefit of the American people. Marginal price auctions for energy are not ensuring the reliability of the grid and are not passing the full economic benefits of subsidized renewables on to customers. FERC needs to reexamine the RTOs under its jurisdiction to make sure that they procure reliable and affordable electricity for the benefit of the American people. l Ensure that RTOs return to market fundamentals so that they serve customers, not special interests and political causes. FERC should require RTOs to ensure that reliable, dispatchable resources are properly valued to provide electricity when needed for the benefit of customers. Potential reforms could include: 1. Requiring renewable generators to provide intra-day backup by dispatchable on-demand generation so that bids by intermittent resources into RTOs equate fairly with far more valuable on-demand dispatchable resources; 2. Creating dual energy markets for dispatchable and nondispatchable resources; or 3. Eliminating capacity markets where intermittent resources participate and instead establishing “reliability” markets where dispatchable on-demand resources participate. Alternatives to marginal price auctions also should be considered. l Direct the RTOs to ensure that the economic benefits of renewables (like tax credits and no fuel costs) are passed on to customers. — 405 — Department of Energy and Related Commissions l End undue discrimination that allows subsidized resources to distort price formation in RTOs. l Affirm its commitment that states will decide whether to join an RTO instead of imposing RTOs on regions that do not want them. FERC should also consider allowing states to enter into non-RTO power pools with alternative structures for the sharing of resources and electric generation. FERC: ELECTRIC TRANSMISSION Mission/Overview Under the Federal Power Act, FERC has the authority to regulate the rates, terms, and conditions of interstate electric transmission. (Pursuant to court cases, interstate transmission can be entirely within a state, although the part of Texas served by ERCOT is not under FERC transmission jurisdiction.) Needed Reforms FERC has been considering how to plan for and allocate costs for new trans- mission lines and how new generation resources will be interconnected to the transmission grid. (Transmission expansion and replacement decisions are usu- ally made by local utilities or by an RTO or regional planning entity). Through two major rulemakings,118 FERC is attempting to facilitate the building of more long-range transmission lines and to socialize more of the costs of transmission buildouts to more customers in order to make it cheaper for renewable develop- ers (primarily) to interconnect to the grid and sell their power. Socializing such costs is a form of subsidy for generators and will cause further price distortions in RTOs and ISOs that will make it less economical for reliable, dispatchable resources like coal, nuclear, and natural gas to stay operational and support reliability.119 Also, under the Infrastructure Investment and Jobs Act, DOE and FERC are granted authority to site and permit high-priority transmission lines as National Interest Electric Transmission Corridors (NIETCs). The Inflation Reduction Act provides funding to DOE to support transmission expansion.120 These initiatives will undermine state input and decision-making. FERC will consider rules on how NIETC transmission applications are to be made. New Policies FERC should either change course on its existing transmission rulemakings (if still in progress) or issue a new rulemaking to:

Department of Energy and Related Commissions

Moderate
Vector: 67%
Pages: 434-436AI Enhanced

AI Analysis:

"The bill focuses on improving load forecasting accuracy and transparency through regional coordination and PURPA amendments, which aligns with Project 2025's broader goals of grid reliability and FERC-led reforms, though it does not directly address dispatchable resource pricing, reserve margin calculations, or natural gas infrastructure expansion as emphasized in the policy."

Key themes:FERC reformgrid reliabilityregional coordinationelectricity forecastingutility regulation

— 402 — Mandate for Leadership: The Conservative Promise New Policies l Reform RTOs to require reliability. FERC should direct RTOs to establish reliability pricing for eligible dispatchable generation resources or require intermittent resources to procure backup power for times when they are not available to operate. In addition, Congress should repeal subsidies for generation resources. l Update the definition and calculation of reserve margins to support reliability. FERC, NERC, and DOE should revise the definition of reserve margins to ensure the grid’s reliability throughout the day and the year. This will mean recognizing that reserve margins may need to consider “net peak” and exclude non-dispatchable resources from inclusion in reserve margin calculations. l Expand and protect natural gas infrastructure in support of electric generation. FERC needs to ensure that its consideration of natural gas pipeline applications recognizes the role that natural gas plays in electric reliability. FERC also needs to make sure that RTO pricing mechanisms support generators that need to contract for natural gas service on a firm basis. l Support resource diversity and reliability. FERC, NERC, and DOE play key roles in balancing consumer, industrial, and national defense interests to ensure an ongoing reliable, plentiful, and accessible national electricity supply. NERC reliability reviews and FERC’s reliability roles should be aware that overreliance on any one power generation fuel source entails concurrent cost and availability risk. FERC should reform market rules that unduly discriminate against dispatchable resources needed for reliability. l Strengthen security against cyber and physical threats. FERC and NERC need to enhance the security of the bulk power system by, for example, banning Chinese-made components, investing in transformers, and hardening substations and other critical infrastructure. DOE should play a leading role in identifying and addressing threats to the grid. FERC: RTOS/ISOS AND “ELECTRIC POWER MARKETS” Mission/Overview For more than 20 years, FERC has issued regulations and directed policies for the creation and operation of regional transmission organizations (RTOs) and independent system operators (ISOs) to manage the dispatch of generation and — 403 — Department of Energy and Related Commissions transmission of electricity.115 Under the misnomer “electric power markets,” these regulatory constructs use marginal price clearing auctions (in some cases both hourly day-ahead auctions and five-minute day-of-need auctions) and locational marginal pricing to procure electric generation and set prices to meet the needs of the grid. Some RTOs also have capacity auctions. Of the nation’s seven RTOs, six are subject to FERC jurisdiction (but not ERCOT in Texas). Areas without an RTO include the Southeast and portions of the West (although California is in an RTO). Needed Reforms Too many conservatives have assumed that because RTOs are described as “electric power markets,” market forces of supply and demand set electric prices and benefit customers. RTOs are complex regulatory constructs (with rules set by FERC) that obscure government interference and preferences for preferred resources. Furthermore, government preferences and subsidies for resources like wind and solar distort price formation for electricity that is undermining the reli- ability of the grid. Finally, customers are not seeing the full economic benefits that non-fuel, subsidized resources should provide. Additionally: l Electric reliability is threatened in many RTOs. As subsidized renewables (like wind and solar receiving tax credits) and state renewable portfolio standards (RPS) programs have disrupted market functions, price distortions have driven out reliable, dispatchable resources like coal, natural gas, and nuclear generation in various RTOs. The result: Electric reliability is decreasing in many parts of the country.116 As noted, FERC and NERC have been studying the potential for summer and winter shortages.117 l RTOs are not providing the full economic benefits of renewables to customers. Because RTOs use marginal price auctions where natural gas usually sets the clearing price paid to all generators, the economic benefits of renewables (no fuel, tax credits, etc.) are flowing mainly to renewables investors and not to customers (although customers do benefit from some decrease in marginal costs). Yet reliability is decreasing, so customers are getting the worst of both worlds, paying more for electricity and having less reliability for the money. l Big Green and Big Tech want RTO expansion. Renewable developers, large industrial users, and Big Tech tend to want RTO expansion for their own economic and ESG reasons. These entities can benefit economically from the complexity and marginal pricing regime of the RTOs. Increased costs and reliability problems are often shifted to other customers.

Department of Energy and Related Commissions

Moderate
Vector: 67%
Pages: 443-445AI Enhanced

AI Analysis:

"The bill focuses on improving electric load forecasting accuracy and reliability through regional coordination and federal oversight, which aligns with Project 2025's emphasis on grid security and resilience under the Department of Energy. However, the bill does not explicitly address bulk-power system security, executive orders, or critical infrastructure protection as outlined in the specific Project 2025 policy section cited."

Key themes:grid reliabilityelectricity forecastingDepartment of Energy oversightenergy infrastructurefederal-state coordination

— 411 — Department of Energy and Related Commissions 19. President Donald J. Trump, Executive Order 13920, “Securing the United States Bulk-Power System,” May 1, 2020, in Federal Register, Vol. 85, No. 86 (May 4, 2020), pp. 26595–26599, https://www.govinfo.gov/content/ pkg/FR-2020-05-04/pdf/2020-09695.pdf (accessed February 13, 2023). 20. 18 U.S. Code § 824a(c), https://www.law.cornell.edu/uscode/text/16/824a (accessed February 27, 2023). 21. Report No. 117-98, Energy and Water Development and Related Agencies Appropriations Bill, 2022, Committee on Appropriations, U.S. House of Representatives, 117th Cong. 1st Sess., July 20, 2021, p. 6, https:// www.congress.gov/117/crpt/hrpt98/CRPT-117hrpt98.pdf (accessed February 13, 2023). 22. H.R. 3684, Infrastructure Investment and Jobs Act, Public Law No. 11-58, 117th Congress, November 15, 2021, Division J, Title III. 23. U.S. Department of Energy, Office of Chief Financial Officer, Department of Energy FY 2023 Congressional Budget Request, Budget in Brief, p. 7. 24. Timothy Gardner, “White House Asks Congress for $500 mln to Modernize Oil Reserve,” Reuters, November 16, 2022, https://www.reuters.com/article/usa-oil-spr-idAFL1N32C36I (accessed February 13, 2023). 25. U.S. Department of Energy, Office of Electricity, “Our History,” https://www.energy.gov/oe/about-us/our- history (accessed February 13, 2023). 26. Press release, “Secretary of Energy Signs Order to Mitigate Security Risks to the Nation’s Electric Grid,” U.S. Department of Energy, December 17, 2021, https://www.energy.gov/articles/secretary-energy-signs-order- mitigate-security-risks-nations-electric-grid (accessed February 13, 2023). 27. U.S. Department of Energy, Office of Electricity, “Revocation of Prohibition Order Securing Critical Defense Facilities,” Federal Register, Vol. 86, No. 76 (April 22, 2021), pp. 21308–21309, https://www.govinfo.gov/ content/pkg/FR-2021-04-22/pdf/2021-08483.pdf (accessed February 13, 2023). 28. U.S. Department of Energy, Office of Chief Financial Officer, Department of Energy FY 2023 Congressional Budget Request, Budget in Brief, pp. 19 and 61. 29. U.S. Department of Energy, Office of Nuclear Energy, “About Us,” https://www.energy.gov/ne/about-us (accessed February 13, 2023). 30. H.R. 3809, Nuclear Waste Policy Act of 1982, Public Law No. 97-425, 97th Congress, January 7, 1983, https:// www.congress.gov/97/statute/STATUTE-96/STATUTE-96-Pg2201.pdf (accessed February 24, 2023). 31. The Heritage Foundation, “Budget Blueprint for Fiscal Year 2023: Reduce the DOE Office of Nuclear Energy,” https://www.heritage.org/budget/pages/recommendations/1.270.127.html. 32. U.S. Department of Energy, Office of Chief Financial Officer, Department of Energy FY 2023 Congressional Budget Request, Budget in Brief, pp. 23 and 58. 33. 42 USC § 16291, https://www.law.cornell.edu/uscode/text/42/16291 (accessed February 27, 2023). 34. U.S. Department of Energy, Office of Fossil Energy and Carbon Management, “About Us: Mission,” https:// www.energy.gov/fecm/mission (accessed February 13, 2023). 35. U.S. Government Accountability Office, Carbon Capture and Storage: Actions Needed to Improve DOE Management of Demonstration Projects, GAO-22-105111, December2021, https://www.gao.gov/assets/gao-22- 105111.pdf (accessed February 13, 2023). 36. International Energy Agency, The Role of Critical Minerals in Clean Energy Transitions, World Energy Outlook Special Report, revised March 2022, https://iea.blob.core.windows.net/assets/ffd2a83b-8c30-4e9d-980a- 52b6d9a86fdc/TheRoleofCriticalMineralsinCleanEnergyTransitions.pdf (accessed February 13, 2023). 37. See 42 U.S. Code § 16291. 38. 42 U.S. Code Ch. 55, §§ 4321–4347, https://www.law.cornell.edu/uscode/text/42/chapter-55 (accessed February 27, 2023). 39. Nuclear Regulatory Commission, “Categorical Exclusions from Environmental Review,” Advance Notice of Proposed Rulemaking; Request for Comment, Federal Register, Vol. 86, No. 87 (May 7, 2021), pp. 24514–24516, https://www.govinfo.gov/content/pkg/FR-2021-05-07/pdf/2021-09675.pdf (accessed February 27, 2023), and Nuclear Regulatory Commission, “Categorical Exclusions from Environmental Review,” Advance Notice of Proposed Rulemaking; Reopening of Comment Period, Federal Register, Vol. 86, No. 160 (August 23, 2021), pp. 47032–47033, https://www.govinfo.gov/content/pkg/FR-2021-08-23/pdf/2021-18058.pdf (accessed February 27, 2023). 40. U.S. Department of Energy, Office of Chief Financial Officer, Department of Energy FY 2023 Congressional Budget Request, Budget in Brief, pp. 19, 21, 23, and 52. — 412 — Mandate for Leadership: The Conservative Promise 41. U.S. Department of Energy, Office of Chief Financial Officer, Department of Energy FY 2023 Congressional Budget Request, Budget in Brief, pp. 3, 6, 12, 19, 21, and 23. 42. S. 622, Energy Policy and Conservation Act, Public Law 94-163, 94th Congress, December 22, 1975, https:// www.congress.gov/94/statute/STATUTE-89/STATUTE-89-Pg871.pdf (accessed February 27, 2023). 43. H.R. 6, Energy Policy Act of 2005, Public Law No. 109-58, 109th Congress, August 8, 2005, https://www. congress.gov/109/plaws/publ58/PLAW-109publ58.pdf (accessed February 27, 2023). 44. U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, “About the Office of Energy Efficiency and Renewable Energy,” https://www.energy.gov/eere/about-office-energy-efficiency-and- renewable-energy (accessed February 28, 2023). 45. Ibid. 46. See note 41, supra. 47. U.S. Department of Energy, Office of Chief Financial Officer, Department of Energy FY 2023 Congressional Budget Request, Budget in Brief, pp. 19, 23, 43, and 49. 48. See U.S. Department of Energy, Grid Deployment Office, “About Us,” https://www.energy.gov/gdo/about-us (accessed February 13, 2023). 49. U.S. Department of Energy, Grid Deployment Office, “Building a Better Grid Initiative,” https://www.energy. gov/gdo/building-better-grid-initiative (accessed February 13, 2023). 50. U.S. Department of Energy, Office of Chief Financial Officer, Department of Energy FY 2023 Congressional Budget Request, Budget in Brief, pp. 2, 19, 21, 23, and 84. “The FY 2023 Budget Request to Congress proposes to split the Electricity appropriation account into two accounts: Electricity and Grid Deployment Office (GDO). Had the proposed FY 2023 structure been in place in FY 2021 and FY 2022, the $7,000,000 shown under the Electricity account’s Transmission Permitting and Technical Assistance (TPTA) program would have appeared under Grid Technical Assistance in GDO and the $3,000,000 shown under Program Direction in the Electricity account represents the estimated share of Electricity PD funding associated with TPTA and would have appeared under Program Direction in GDO.” Ibid., p. 84, note. 51. U.S. Department of Energy, Office of Clean Energy Demonstrations, “About Us: Our Mission,” https://www. energy.gov/oced/about-us (accessed February 13, 2023). 52. U.S. Department of Energy, Office of Chief Financial Officer, Department of Energy FY 2023 Congressional Budget Request, Budget in Brief, p. 6. 53. U.S. Department of Energy, Office of Clean Energy Demonstrations, “About Us: Our Story,” https://www. energy.gov/oced/about-us (accessed February 28, 2023). 54. U.S. Department of Energy, Office of Clean Energy Demonstrations, “OCED Project Portfolio,” https://www. energy.gov/oced/office-clean-energy-demonstrations (accessed February 28, 2023). 55. U.S. Department of Energy, Office of Chief Financial Officer, Department of Energy FY 2023 Congressional Budget Request, Volume 3, Cybersecurity, Energy Security, and Emergency Response, Federal Energy Management Program, Grid Deployment Office, Indian Energy Policy & Programs, Loan Programs, Manufacturing & Energy Supply Chains, Office of Clean Energy Demonstrations, Petroleum Reserves, Power Marketing Administrations, State and Community Energy Programs, April 2022, p. 104, https://www.energy. gov/sites/default/files/2022-09/doe-fy2023-budget-volume-3-v2.pdf (accessed February 13, 2023). 56. See, for example, ibid., pp. 104 and 107. 57. U.S. Department of Energy, Loan Program Office, “LPO Year in Review 2022: New Legislation,” January 5, 2023, https://www.energy.gov/lpo/articles/lpo-year-review-2022 (accessed February 28, 2023). Emphases in original. 58. H.R. 6256, To Ensure That Goods Made with Forced Labor in the Xinjiang Uyghur Autonomous Region of the People’s Republic of China Do Not Enter the United States Market, and for Other Purposes, Public Law No. 117-78, 117th Congress, December 23, 2021, https://www.congress.gov/117/plaws/publ78/PLAW-117publ78.pdf (accessed February 28, 2023). 59. H.R. 2272, America COMPETES Act, Public Law 110–69, 110th Congress, August 9, 2007, § 5012, https://www. congress.gov/110/plaws/publ69/PLAW-110publ69.pdf (accessed February 13, 2023). 60. Ibid., § 5012(c)(1). 61. U.S. Department of Energy, Office of Chief Financial Officer, Department of Energy FY 2023 Congressional Budget Request, Budget in Brief, March 2022, p. 103.

Showing 3 of 5 policy matches

About These Correlations

Policy matches are calculated using a hybrid approach: initial candidates are found using semantic similarity between bill summaries and Project 2025 policy text, then an AI model (Llama 3.1 70B) provides detailed alignment ratings and analysis. Ratings range from 1 (minimal alignment) to 5 (very strong alignment). This analysis does not imply direct causation or intent.

Full Policy Text

Related Bills